Summit High School

Back to Main Page

Facility Discipline Description of Work Category Status
Summit HS Civil Concrete Joint Sealant Preventive  
Summit HS Civil 4-inch Concrete Sidewalk Repair Capital  
Summit HS Arch Add control joints and repair plaster soffit at baseball field concessions Capital  
Summit HS Code Add access ramp to third egress door in library capital  
Summit HS Arch Replace broken handicap ramp to athletic fields Capital  
Summit HS Code Provide curb ramp paint at all locations capital  
Summit HS Code Add compliant egress door ramps (2 in rear 2 in front right) Capital  
Summit HS Arch Refinish stair tread and risers at 2nd floor locker rooms Capital  
Summit HS Arch Replace damaged overhead door at baseball storage building Capital  
Summit HS Civil Grading Improvement / Debris Clean-Up Capital  
Summit HS Code Provide access ramp to cafeteria platform Capital  
Summit HS Civil Concrete Pavement Crack Sealing Preventive  
Summit HS Civil Concrete Failure Repair (Full Panel Replacement, No Subgrade Repair) Capital  
Summit HS Code Renovate competition gym to provide accessible seating throughout Capital  
Summit HS Arch Repair brick retaining wall and add weeps Capital  
Summit HS MEP Replace pole light on football field Capital  
Summit HS Civil 6-inch Concrete Curb & Gutter (Remove & Replace) Capital  
Summit HS Code Replace portable ramps Capital  
Summit HS Code Resolve typical protruding EWCs in corridors (skirts) Capital  
Summit HS PAC MEP Install occupancy sensors Energy Conservation  
Summit HS Struct Repair CMU Cracks Repair  
Summit HS Arch Install new screens at operable windows Capital  
Summit HS Arch Replace gates to trash compactor Capital  
Summit HS Arch Replace damaged overhead door at baseball storage building Capital  
Summit HS Arch Add control joints and repair plaster soffit at baseball field concessions Capital  
Summit HS Arch Tuck and point masonry mortar joints where movement has occurred Capital  
Summit HS Civil Concrete Settlement Repair Preventive  
Summit HS Code Add 4 HC parking spots, access path, curb ramp to left lot capital  
Summit HS Arch Refinish various doors Capital  
Summit HS Civil Grouted Rock Rip-Rap Preventive  
Summit HS Arch Repair damaged masonry walls, lintels and foundations in various locations around building Capital  
Summit HS Code Miscellaneous multi user restroom repairs Capital  
Summit HS Arch Reseal exterior control joints, expansion joints, windows and utility openings Capital  
Summit HS Arch Replace lay-in ceilings w/ hard ceilings at all multi-user restrooms Preventative  
Summit HS Code Miscellaneous Fieldhouse locker room renovations (shower, bench etc.) Capital  
Summit HS Arch Replace Kitchen flooring w/ seamless Capital  
Summit HS MEP Add air conditioning to IDF rooms Capital  
Summit HS MEP Replace recalled sprinkler heads Capital  
Summit HS Arch Misc. interior renovations and repairs Capital   
Summit HS MEP Cast iron sewer pipe replacement in PE locker rooms Capital  
Summit HS Code Miscellaneous science lab upgrades needed (compliant workstations, sinks, and emergency equipment) Capital  
Summit HS Arch Paint exterior hollow metal doors and frames, soffits and other previously painted items Capital  
Summit HS MEP Replace gym HID lighting with T5 Energy Conservation  
Summit HS Arch Refinish restrooms Capital  
Summit HS MEP Restroom renovation A, E, J, C Halls & commons area Capital  
Summit HS   Replace ceilings in all classrooms Capital  
Summit HS   Replace carpet in classrooms & A B C halls Capital  
Summit HS MEP Add electrical panels for technology upgrade Capital  
Summit HS   Paint classrooms Capital  
Summit HS Arch Paint interior Capital  

Back to Main Page