Icenhower Intermediate School

Back to Main Page

Facility Discipline Description of Work Category Status
Della Icenhower Struct Repair CMU Cracks Repair  
Della Icenhower Civil Concrete Failure Repair (Full Panel Replacement, No Subgrade Repair) Capital  
Della Icenhower Civil 6-inch Concrete Curb & Gutter (Remove & Replace) Capital  
Della Icenhower Civil 4-inch Concrete Sidewalk Repair Capital  
Della Icenhower Code Add compliant curb ramp in rear drop off area capital  
Della Icenhower Civil Debris Clean-Up (Minor) Preventive  
Della Icenhower MEP Add AC to 2nd floor electric room by 217 (HOT) Capital  
Della Icenhower Arch Add secured entrance w/ doorbell Capital  
Della Icenhower Arch Add replace existing sound system in cafeteria Capital  
Della Icenhower MEP Replace electric water heaters (2014) Capital  
Della Icenhower MEP Replace condensate pipe (broken, ruptured) Capital  
Della Icenhower Kitchen MEP Replace kitchen MUA Fan (2014) Capital  
Della Icenhower Kitchen MEP Replace kitchen HVAC diffusers and grilles (2014) Capital  
Della Icenhower Kitchen MEP Replace kitchen exhaust fans Capital  
Della Icenhower Kitchen MEP Replace kitchen gas water heaters (2014) Capital  

Back to Main Page